|
|
||||||||||||||||||||||||||||||||||||||||||||
Chemilink™ SS-224Acrylic Polymer Cementitious Coating (APCC, Fast Setting)Chemilink™ SS-224 (Fast Setting) is a two-part, high performance cement-based coating material blended with acrylic polymer. Part A is the grey powder consisting of special cements, hydraulic binders and other additives to enhance workability, adhesion, setting and hardening properties. Part B is the milky-white emulsion consisting of acrylic polymer and other appropriate additives. SS-224 is recommended as an abrasion, skid and water resistance coating for both internal and external applications. It is designed to cover surfaces at a rate of 3 to 5mm in thickness per single placement. It is however NOT designed to take heavy traffic load and NOT for structural purpose. Advantages
Applications
Technical Data
Application ProcedureSurface PreparationThe surface of the area to be treated should be clean and free from dust, dirt, grease and/or other loose contaminants. Pressured washing is recommended for this surface cleaning task. All concrete substrates must be structurally sound and all cracks must be routed out and repaired with appropriate repair compounds. Once the area is clean, brush or roll ChemilinkTM SS- 232 (primer) evenly onto the surface. Depending on the environment, it may take approximately 5 to 30 minutes for the primer to become touch-dry. Note that the primer is designed to improve adhesion; to prevent the coating material from debonding and to prevent pinholes on the finished surface. Use the primer directly from the container – do NOT dilute; do NOT blend with any other product. Stir the primer contents well before use. The primer should be re-applied if the primer-treated surface is disturbed or it has been primed for more than 6 hours. Under the conditions that the ground (surface to be treated) temperature is above 45°C, the surface should be wetted and cooled down to avoid flash set of the primer. MixingWhen the primer is touch-dry, add approximately 4.5-5.0 L of SS-224 Part B (liquid) to a clean bucket or pail (capacity of 20 L) , and then slowly add a 25 kg bag of SS-224 Part A (powder) while it is being electrically stirred. Do NOT add Part B (liquid) to Part A (powder). Ensure 2 to 3 minutes of mixing time till the mixture is homogeneous and lump-free. Note that electric stirring (mixing gun or other mechanical stirrer with rotation speed of ≥ 1,300 rpm) is highly recommended. Concrete mixers or hand mixing are not suitable mixing methods. ChemilinkTM SS-224 (Fast Setting) is a rapid setting product. The mixture should be placed within 5-10 minutes after 2 – 3 minutes of mixing. Do NOT mix more material than that can be placed within 5-10 minutes. Clean mixers and tools thoroughly immediately after each batch to avoid material buildup. Use clean equipment for mixing. For any additional instructions that are not covered above, please kindly contact the product principal. Placing and FinishingAfter mixing, place the mortar mix onto the primed surface; move it to position with an underlayment spreader. SS-224 (Fast Setting) may be placed for a thickness between 3 mm and 5 mm. When SS-224 (Fast Setting) is close to surface dry, which is usually within 3 to 10 minutes after the mixture is placed, it is recommended to apply a thin layer of SS-232 onto the finishing surface using a sponge or an equivalent tool, to improve the durability. For anti-skid surfaces, broom the finishing surface to a desired texture shortly after the placement of mixture. The mortar mixture may support foot traffic within 45 minutes (fair days) to 75 minutes (cloudy days) after placement depending on the environment (ambient temperature, relative humidity, ventilation in case of indoor or interior applications, surface to be treated, thickness of placement, amount of mixing water etc). CuringIn hot and dry conditions, SS-224(Fast Setting) should be cured with water spraying or appropriate curing compound and the finishing surface is highly recommended to be treated with an appropriate sealant. Usage and CoverageThe recommended thickness is 3 to 5 mm per layer. For placement of more than one layer, each subsequent layer should only be placed after the previous layer has been hardened (a minimum of 24 hours). One 30 kg set of SS-224 (Fast Setting) will yield approximately 0.0135 m3 or 13.5 liters, and cover approximately:
Package and CoveragePackage : approx. 30 kg set, consisting of Part A – 25 kg powder and Part B – 5 kg emulsion. SafetySS-224 (Fast Setting) is cement based, alkali in nature and non-hazardous. It is recommended that applicators wear PVC or equivalent gloves and safety goggles when using SS-224. In case of eye contact, wash thoroughly with clean water and if irritation persists, please seek medical treatment immediately. |
Copyright © 2011 Chemilink Technologies Group Pte Ltd. All Rights Reserved |