|
Our Products >> SS-200 Series for Building Construction >> | ||||||||||||||||||||||||
Chemilink™ SS-236Polymer Modified Repair Mortar for Industrial SurfaceChemilink™ SS-236 is a ready-to-use mortar made of graded silica sand, special cement, polymer and additives. It contains no calcium chloride or heavy metals. It is designed for high strength, long service life and easy application. It is a quality controlled high performance composition which will achieve high compressive strength and other various mechanical characteristics. The presence of a polymer ensures an excellent bond to most surfaces and enhances such properties in impermeability, flexural and tensile strengths. It is suitable for heavily trafficked areas such as highways where abrasion and impact resistance are required. Functions
Applications
Technical Data
Application ProcedureSurface PreparationThe surface of the area to be treated should be clean and free from dust, dirt, grease and/or other loose contaminants. Pressured washing is recommended for this surface cleaning task. All concrete substrates must be structurally sound and all cracks must be routed out and repaired with appropriate repair compounds. Once the area is clean, brush or roll ChemilinkTM SS-232 (primer) evenly onto the surface. Depending on the environment, it may take approximately 5 to 30 minutes for the primer to become touch-dry. Once the area is clean, brush or roll ChemilinkTM SS-232 (primer) evenly onto the surface. Depending on the environment, it may take approximately 5 to 30 minutes for the primer to become touch-dry. Note that the primer is designed to improve adhesion and impermeability; to prevent the coating material from debonding and to prevent pinholes on the finished surface. Use the original primer from the container – do NOT dilute; do NOT blend with any other product. Stir the primer contents well before use. The primer should be reapplied if the primer-treated surface is disturbed or it has been primed for more than 6 hours. Under the conditions that the ground (surface to be treated) temperature is above 45°C, the surface should be wetted and cooled down to avoid flash set of the primer. MixingWhen the primer is touch-dry, add approximately 6.0 L of water to a clean bucket or pail (capacity of 20 L), and then slowly add a 25 kg bag of SS-236 while it is being electrically stirred. Ensure 2 to 3 minutes of mixing time till the mixture is homogeneous and lump-free. Note that electric stirring (mixing gun or other mechanical stirrer with rotation speed of ≥ 1,300 rpm) is highly recommended. Thoroughly clean mixers and tools immediately after each batch to avoid material buildup. Use clean equipment for mixing. For any additional instructions. Placing and FinishingAfter mixing, place the mortar mix onto the primed surface; move it to position with an underlayment spreader. SS-236 may be placed for a thickness between 5 mm and 10 mm. CuringIn hot and dry conditions, SS-236 should be cured with appropriate curing compound and the finishing surface is highly recommended to be treated with an appropriate sealant. Usage and CoverageThe recommended thickness is 5 to 10 mm per layer. For placement of more than one layer, each subsequent layer should only be placed after the previous layer has been hardened (a minimum of 24 hours). One 25 kg bag of SS-236 yields approximately 0.0135 m3 or 13.5 liters, and cover approximately:
Package, Coverage & Shelf LifePackage : 25kg/bag; SafetyGloves and goggles should be worn. Any splashes to the skin or eyes should be washed off with clean water. In the event of prolonged irritation, seek medical advice. Powder products should be handled to minimize dust formation. Use a light mask if excessive dusting is unavoidable. |
Copyright © 2011 Chemilink Technologies Group Pte Ltd. All Rights Reserved |